Login
ISO-14001 white   ISO-14064-1 white-312    Carbon Neutral-white 58x60px
phn0800 442 182
 
04461

EV Ready Kits for Homes

EV Ready Kits for Homes
larger imageMove mouse over the image to magnify
Installing an EV ready kit (or two) in any new build house or renovation is the easiest way to ensure that when the time comes to install a Wallbox Pulsar EV charging station it is a simple, easy and neat. These kits will future-proof any new build while giving you the convenience of immediate access to a domestic 10 amp double socket. When you require an EV charging station it is quick and easy for an electrician to swap out the adaptor plate and socket outlet for a Wallbox Pulsar or Pulsar Plus unit (not included).
The charging station supply cable is heavier than a normal electrical lead, so it is important that the Wallbox has a solid mount.  Installing an EV ready kit when a house is built ensures that the charging station will never pull out of the plaster board.
KIT CONTENTS
  • Mounting bracket for EV charging station
  • Adaptor plate and domestic 10-amp socket outlet (so you have additional working power points until EVSE is installed) 
  • 6mm2 XLPE supply cable to connect EV ready kit to electrical distribution board (Note: XLPE has higher heat rating than standard house wiring, and some EV brands require this cable be used)
  • 230V rated communications cable to ensure home sharing and power sharing
WHERE TO INSTALL
Unfortunately (due to design) the location of the charging port on the EV is not always in the same location.
In order to have the most flexibility in your installation, two EV ready kits would be installed.
  • One in the middle of the front wall of the garage  
  • One on the non-working side (the side without the access door) of the garage close to the garage door
Depending on potential future charging requirements, you could also choose to mount on outside.
The EV ready kit also ensures a stable base to support your EV charger.  While the weight of a Wallbox is not high, the constant use means a good secure attachment (to stud or similar) will offer a better more secure installation in the long term. 
When it comes time to mount your EV charging station, what would typically be a four-five hour job becomes a 15min job.  
If you upgrade in the future to an EV with a charge port in a different location, the charging station can be moved to the other EV ready location just as quickly with no need for cutting or drilling.
POWER SHARING & HOME SHARING
Power sharing and home sharing ensures that the house is never overloaded.  All new EV can use half the houses allocated electrical supply, so taking measures to avoid overloading is important.  The EV ready kit covers these requirement as well as ensuring more charging stations can be added for more EV.
DATASHEET
e-Mobility EVC-EVREADY Kit v2
Cat No. Kit Description Qty
EVC-EVREADY-5M-WH
EV Ready Kit, 5m of 6mm2 XLPE cable, Comms cable, White face plate unit
EVC-EVREADY-10M-WH
EV Ready Kit, 10m of 6mm2 XLPE cable, Comms cable, White face plate unit
EVC-EVREADY-10M-BK
EV Ready Kit, 10m of 6mm2 XLPE cable, Comms cable, Black face plate unit
EVC-EVREADY-15M-WH
EV Ready Kit, 15m of 6mm2 XLPE cable, Comms cable, White face plate unit
EVC-EVREADY-15M-BK
EV Ready Kit, 15m of 6mm2 XLPE cable, Comms cable, Black face plate unit

You might also be interested in ...

Signup for Juice & Email Specials

TransNet Juice is a regular industry publication that delivers our latest news, products and special offers to industry members.  Our email specials are available for purchase through all good electrical wholesalers.

btn signup
 

Contact us

phn1+64 9 274 3340 (NZ)
     +61 417 387 489 (AUS)
building+64 9 274 5490
mail   sales@transnet.co.nz

mail   78 Cryers Road, East Tamaki
         Auckland, New Zealand
         
         PO Box 8117, Summerland Point
         NSW 2259, Australia
Facebook-977 
Follow us on Facebook